Air Emission Event Report Database Incident 354647

Incident Tracking Number: 354647 Incident Status: OPEN
Report Type: INITIAL Report Date: 04/23/2021
Name of Owner or Operator: SABINAL ENERGY OPERATING LLC CN: CN605423953
Regulated Entity Name: RUDD NO 1 RN: RN101964039
Physical Location: FROM SEMINOLE GO S ON SH 181 4M TURN R ON NADINE RD FOR 3.5M TO GA
County: GAINES
Event/Activity Type: EMISSIONS EVENT
Date and Time Event Discovered or Scheduled Activity Start: 04/22/2021 09:00 PM
Date and Time Event or Scheduled Activity Ended: 05/02/2021 09:00 PM
Event Duration: 240 hours, 0 minutes
Process Unit or Area Common Names
Rudd No 1
Facility Common Name Facility Identification Number (FIN)
Rudd No 1
1 - Emission Point Common Name: Emission Point Number:
Rudd No 1 Emergency Flare
List of Air Contaminant Compounds - 5 total
Description Est. Quantity/
Opacity
Units Emission
Limit
Units Authorization
Carbon Monoxide 339.51 POUNDS 0.0   NA
Hydrogen Sulfide 70.51 POUNDS 0.0   NA
NATURAL GAS 355.0 POUNDS 0.0   NA
Oxides of Nitrogen (NOx) 170.66 POUNDS 0.0   NA
Sulfur dioxide 6626.55 POUNDS 0.0   NA
Cause of Emission Event or Excess Opacity Event, or Reason for Scheduled Activity:
DCP midstream contacted Sabinal and notified us of their Goldsmith plant going down. A reason was not initially given, nether were they able to provide an estimated time of returning to normal. This was unavoidable and unforeseen; therefore, it should meet the affirmative defense criteria.
Actions Taken, or Being Taken, to Minimize Emissions And/or Correct the Situation:
Within Levels conducive to a safe working environment, the field and battery were allowed to build up before any gas was routed to the emergency flare. Sabinal Energy will discontinue flaring immediately upon DCP completing repairs, thus allowing them to resume taking our gas.
Basis Used to Determine Quantities and Any Additional Information Necessary to Evaluate the Event:
Reportable quantities, process knowledge, excel spreadsheet, metered volumes, and gas analysis were used in the calculations. DID break RQ
Initial Notification Date/Time: 04/23/2021 08:29 AM Method: STEERS
Notification Jurisdictions: REGION 07 - MIDLAND
Publication Status: VERIFIED BY A CUSTOMER